Solar Park Poľany

Start of operation

2011

Solárny park Poľany green energy slovakia

About project

The Solar Park Poľany was commissioned in 2011 and consists of two separate installations, each with a capacity of 0.999 MWp and its own connection point to the distribution grid. The total installed capacity of the park is therefore 1.998 MWp. It produces approximately 2,300,000 kWh of electricity annually, which is sufficient to cover the consumption of around 580 households. 

A total of 9,744 MASDAR thin film panels are installed across an area of 57,294 m², contributing to a reduction of approximately 1,610 tons of CO₂ emissions annually. green energy slovakia was not directly involved in the implementation of the projects, however, the solar park was managed by green energy services from 2017 to 2022.

In numbers

Total power

1,998 MWp

Annual production

~ 2 300 000 kWh

Coverage of consumption

580 households per year

Emissions savings

~ 1 610 tons of CO₂

Do you have questions or are you interested in any of our services?

Contact us
Rozsiahly solárny park Červenica s radmi solárnych panelov na suchej pôde pod jasným modrým nebomLetecký pohľad na rozsiahly solárny park s radmi solárnych panelov počas západu slnka, zobrazujúci veľkoplošnú solárnu elektráreň