The Solar Park Poľany was commissioned in 2011 and consists of two separate installations, each with a capacity of 0.999 MWp and its own connection point to the distribution grid. The total installed capacity of the park is therefore 1.998 MWp. It produces approximately 2,300,000 kWh of electricity annually, which is sufficient to cover the consumption of around 580 households.
Solar Park Poľany
Start of operation
2011

About project
A total of 9,744 MASDAR thin film panels are installed across an area of 57,294 m², contributing to a reduction of approximately 1,610 tons of CO₂ emissions annually. green energy slovakia was not directly involved in the implementation of the projects, however, the solar park was managed by green energy services from 2017 to 2022.
In numbers
Total power
1,998 MWp
Annual production
~ 2 300 000 kWh
Coverage of consumption
580 households per year
Emissions savings
~ 1 610 tons of CO₂