The Červenica solar park is a modern facility with an installed capacity of 0.800 MWp, consisting of more than 8,500 thin-film panels from QS Solar and Mitsubishi. It covers an area of over 31,000 m².
Červenica Solar Park
Start of operation
2011

About project
It generates approximately 929,000 kWh of electricity per year, covering the energy needs of more than 220 households. At the same time, it contributes to ecological balance by reducing CO₂ emissions by approximately 650 tons per year. The park was launched in 2011 and belongs to the WEON Group portfolio.
In numbers
Total power
0,800 MWp
Annual production
~ 929 000 kWh
Coverage of consumption
220 households per year
Area of the park
31 627 m2
Installed panels
8 544
Emissions savings
~ 650 tons of CO₂