The Solar Park Buzitka 1 and 2 was commissioned in 2011 and consists of two separate installations, each with a capacity of 0.990 MWp and its own connection point to the distribution grid. Together, the park reaches a total installed capacity of 1.980 MWp. Its annual production is sufficient to cover the electricity consumption of approximately 560 households.
Solar Park
Buzitka 1 & 2
Start of operation
2011

About project
A total of 9,000 polycrystalline Risen Energy SYP220S panels are installed across an area of 47,431 m². The operation of the park contributes to reducing the carbon footprint by approximately 1,575 tons of CO₂ annually. The project is part of the green energy services portfolio, while green energy slovakia was not directly involved in its implementation.
In numbers
Total power
1,980 MWp
Annual production
~ 2 250 000 kWh
Coverage of consumption
560 households per year
Emissions savings
~ 1 575 tons of CO₂