Skalité Wind Farm

Start of operation

2004

About project

The Skalité wind farm consisted of four Vestas V 39/500 wind turbines, each with an installed capacity of 0.5 MW. The total capacity of the farm was 2 MW. Operations were terminated in 2008.

It was able to produce more than 1.5 million kWh of electricity per year, contributing to savings of approximately 1,050 tons of CO₂ annually. The park was put into operation in 2004 as one of the first projects of its kind in Slovakia.

In numbers

Total power

2,00 MW

Annual production

~ 1 500 000 kWh

Coverage of consumption

1 200 households

Emissions savings

~ 1,050 tons of CO₂