In 2013 we have also successfully tried out the development and construction of biogas power plants. Thanks to the experience, we are able to cooperate with you on projects in this energy sector as well.

 

Our complete package of services includes:

Location

In case you don’t yet have a location, we will research the market and provide recommendations

Technology

Based on the previous analyses, we will propose a suitable technology, tailored to the project specifications

Documentation

We will prepare complete documentation, with the final version of the project

Engineering

We will secure all project engineering aspects, including all necessary approvals and permits

Implementation

We will supply both the technology and construction services, and put the system into operation

Maintenance

Through our subsidiary, Global Energy Services, we can also provide complex support services and maintenance

Projects portfolio

Project developed, owned, and serviced by us Project developed and serviced by us Project serviced by us Former project

Projects portfolio

Project developed, owned, and serviced by us Project developed and serviced by us Project serviced by us Former project
list of references

Biogas plant Koš

This project consists of one cogeneration unit with a power of 0,999 MW with its own connection to the distribution system.

Electricity is produced using biogas created from various biological waste material.

Predicted annual production of electricity is 8 200 000 kWh.

Produced electricity covers the annual consumption of 1 900 households.

By switching over to biogas electricity production, 5 740 tons of CO2 emissions are saved annually.

Biogas plant was launched in 2013.

Biogas plant Kokšov-Bakša

This project consists of one cogeneration unit with a power of 0,999 MW with its own connection to the distribution system.

Electricity is produced using biogas created from various biological waste material.

Predicted annual production of electricity is 8 200 000 kWh.

Produced electricity covers the annual consumption of 1 900 households.

By switching over to biogas electricity production, 5 740 tons of CO2 emissions are saved annually.

Biogas plant was launched in 2013.

green energy slovakia s.r.o.
a member of Group WEON group, a.s.

Address:
Mraziarenská 6, 821 08 Bratislava
Slovakia

phone: + 421-2-53 41 16 69
fax: + 421-2-53 41 16 99
e-mail: greenenergy@greenenergy.sk